Request for Information (RFI Sample Clauses

Request for Information (RFI is a written request prepared by the Contractor requesting the Architect to provide additional information necessary to clarify or amplify an item which the Contractor believes is not clearly shown or called for in the drawings or specifications, or to address problems which have arisen under field conditions.

Get the Official Word Add-in

Request for Information (RFI. Request for Information" is the name given to a document issued by Contractor seeking clarification and/or additional information regarding an aspect of the Work. The response to the RFI does not constitute authorization or direction to proceed with any changed or additional work. Changed or additional work must be separately authorized by District.

Request for Information (RFI. A Request for Information is a written request from the CM to the Design Professional seeking an interpretation or clarification of the Construction Documents.

Request for Information (RFI. A written request made by Contractor for additional information to clarify an ambiguity in the Contact Documents.

Request for Information (RFI. An inquiry submitted by the CMR to the DP, requesting clarification or direction. All inquiries other than those considered by the DP to be of low significance, must be submitted and tracked as an RFI. As applicable, each RFI submitted must include information from the CMR regarding any cost or time implications of which he is aware at the time the RFI is submitted. All RFIs must be copied to SCCPSS; in the event SCCPSS wishes to discuss the ASI with the DP or with the CMR, or vice-versa, this should occur immediately upon receipt.

Request for Information (RFI a solicitation used to obtain “state of the art” information on goods and/or services for informational purposes only.

Request for Information (RFI. Contractor is responsible for submitting a written request for interpretation ("RFI") or correction by the RFI/Question deadline specified above. There shall be no verbal understandings or clarifications recognized by the COE. Any interpretation or correction will be posted on the XXX'x website, and the interpretation of the XXX shall prevail. Contractor is responsible for monitoring the website for RFI Responses, RFP Amendments, changes, updates, revisions and/or uploaded documents. Contractor's submittal of a proposal without a written request for interpretation or correction shall be irrefutable evidence that Contractor has determined all documents are sufficient and that the Contractor is capable of delivering the items and services in accordance with the documents and within XXX timelines.

Request for Information (RFI. If Design-Builder encounters any condition which Design-Builder believes, in good faith and with reasonable basis, is the result of an ambiguity, conflict, error or omission in the Contract Documents (collectively the "Conditions"), it shall be the affirmative obligation of Design-Builder to timely notify City, in writing, of the Conditions encountered and to request information from City necessary to address and resolve any such Conditions before proceeding with any portion of the Work affected or which may be affected by such Conditions. If Design-Builder fails to timely notify City in writing of any Conditions encountered and Design-Builder proceeds to perform any portion of the Work containing or affected by such Conditions, Design-Builder shall bear all costs associated with or required to correct, remove, or otherwise remedy any portion of the Work affected thereby without adjustment of the Contract Time or Contract Price. The Contract Time shall not be subject to adjustment in the event that Design-Builder fails to timely request information from City.

Request for Information (RFI. RFIs are issued to determine the availability of products or services in the market. From RFI responses, specification is drawn that will be used to the open market.

Request for Information (RFI. The Consultant shall respond to RFIs as follows based on the following prioritization from the Contractor: High – Engineer to Respond within 1 to 2 Calendar Days Medium – Engineer to Respond within 2 to 5 Calendar Days Low – Engineer to Respond within 5 to 10 Calendar Days